LACONWAP GREEN ENERGY
18 MW Hydroelectric Cascade
18 MW Cascade Program Phase 1 Active (8.0 MW)

Innovative Hydro Energy

For The Future

Elevating Philippine clean energy with Laconwap Green Energy Inc.'s 18.0 MW run-of-river cascade hydroelectric portfolio and USD $35M staged equity investment facility.

18.0MW

TOTAL CASCADE
CAPACITY

$35M

EQUITY INVESTMENT
FACILITY

38.5GWh

ANNUAL CLEAN ENERGY
GENERATION

155M

GROSS HYDRAULIC
HEAD

SC-2020

DOE SERVICE
CONTRACT AWARD

Total Portfolio 18.0 MW
Phase 1 (Active) 8.0 MW
Phase 2 (Pipeline) 6.0 MW
Phase 3 (Pipeline) 4.0 MW
Phase 1 Turbine 2 ร— 4.0 MW Francis
Phase 1 Head 155 m Gross
Phase 1 Energy 38.5 GWh/yr
Phase 1 Penstock 2,700 m
Total Portfolio 18.0 MW
Phase 1 (Active) 8.0 MW
Phase 2 (Pipeline) 6.0 MW
Phase 3 (Pipeline) 4.0 MW
Phase 1 Turbine 2 ร— 4.0 MW Francis
Phase 1 Head 155 m Gross
Phase 1 Energy 38.5 GWh/yr
Phase 1 Penstock 2,700 m
๐ŸŒŠ Multi-Phase Development

18 MW Hydroelectric Cascade Portfolio

Laconwap Green Energy Inc. master development roadmap across the Laconwap River basin. Phase 1 (8.0 MW) represents the active pre-construction stage, followed by Phase 2 (6.0 MW) and Phase 3 (4.0 MW) cascade expansions.

Laconwap River Basin Master Plan

Complete River Cascade Development

Harnessing the full hydrological potential of the Addalam-Laconwap watershed in Quirino & Nueva Vizcaya through a phased 3-stage cascade.

Total Capacity: 18.0 MW
Phase 1: 8.0 MW (44.4%) Phase 2: 6.0 MW (33.3%) Phase 3: 4.0 MW (22.2%)
โšก Phase 1 โ€ข Active Detailed Below
8.0 MW 44.4% Share

Laconwap 3 MHPP

Active flagship project with completed Pre-Feasibility Study, approved DOE Service Contract SC-2020-04-0013, and secured $35M investment facility.

  • โœ“Turbines: 2 ร— 4.0 MW Francis horizontal
  • โœ“Head & Flow: 155 m gross head | 7.0 mยณ/s flow
  • โœ“Energy: 38.5 GWh clean electricity / year
  • โœ“Financing: $35M SVG Facility via Land Bank RMA
View Phase 1 Scheme & Data
๐Ÿ”„ Phase 2 โ€ข Pipeline Cascade Expansion
6.0 MW 33.3% Share

Laconwap Cascade 2

Second stage cascade expansion utilizing the contiguous hydraulic head and river gradient along the Laconwap river valley.

  • โœ“Capacity: 6.0 MW rated power generation
  • โœ“Integration: Synchronized with Phase 1 grid substation
  • โœ“Hydrology: Addalam-Laconwap contiguous catchment
  • โœ“Timeline: Post Phase 1 commissioning
Phase 2 Planned Expansion
๐ŸŒฑ Phase 3 โ€ข Pipeline Cascade Completion
4.0 MW 22.2% Share

Laconwap Cascade 3

Final phase completing the 18.0 MW basin-wide master plan, maximizing energy capture and regional grid reliability in Northern Luzon.

  • โœ“Capacity: 4.0 MW rated power generation
  • โœ“Total Masterplan: Brings combined portfolio to 18.0 MW
  • โœ“Environmental: Zero-storage run-of-river design
  • โœ“Milestone: Completes full watershed potential
Phase 3 Planned Completion
๐Ÿ“Š Phase 1 Milestones

Phase 1 Accomplishments

Key milestones achieved as of December 2025 across technical, legal, and financial domains for the 8.0 MW Phase 1 (Laconwap 3 MHPP).

โšก
Technical

Engineering & Survey

  • โœ“Pre-Feasibility Study (PFS) completed
  • โœ“Detailed Hydrology & Geotechnical Study
  • โœ“Topographic & Watershed Mapping
  • โœ“Engineering Design (Intake, Penstock, Powerhouse)
  • โœ“Google Earth scheme & DOE PRS92 survey approved
๐Ÿ“„
Legal & Regulatory

Permits & Compliance

  • โœ“DOE Service Contract SC-2020-04-0013 awarded
  • โœ“SEC Registration CS202060596
  • โœ“LGU endorsements (Nagtipunan & Dupax del Norte)
  • โœ“NCIP Certification Precondition (CP) application
  • โœ“Community FPIC consultations completed
  • โœ“ECC Environmental Compliance Certificate
๐Ÿ’ฐ
Financial

Investment & Funding

  • โœ“USD $35M Investment Facility secured (SVG)
  • โœ“5-Tranche Equity drawdown structure defined
  • โœ“Land Bank of the Philippines Relationship Manager assigned
  • โœ“โ‚ฑ20M 3-Year Pre-Construction Work Plan budgeted
  • โœ“Board Resolutions & Corporate Governance established

๐ŸŽฏ Next Milestone: Full EPC Commencement

Upon release of NCIP Certification Precondition and final ECC clearance, the project advances to full Engineering, Procurement & Construction (EPC) phase, unlocking the first tranche of the $35M investment facility through Silicon Valley Global PH.

๐Ÿ—บ Engineering & Design

Project Scheme Explorer

Navigate through satellite imagery, official DOE surveys, watershed analysis and engineering plans of the 8 MW facility.

Google Earth Scheme
๐Ÿ›ฐ Satellite Imagery

Google Earth Project Overlay

Aerial view of the Laconwap 3 scheme showing the intake dam at elevation 600m ASL, the 2.7 km penstock alignment following river contours, and the powerhouse at 445m ASL in Nagtipunan, Quirino.

Intake Elevation
600 m ASL
Powerhouse Elev.
445 m ASL
Penstock Length
2,700 m
Gross Head
155 m
๐Ÿ’ง How It Works

Run-of-River Hydropower Process

01
๐Ÿ’ง

Water Intake

River water is diverted at 600m ASL through a weir dam and headrace channel into the penstock system.

02
๐Ÿ”„

Penstock Flow

Water flows through a 2.7 km steel penstock, gaining kinetic energy as it drops 155m in elevation.

03
โšก

Power Generation

High-pressure water spins twin Francis turbines at 750 RPM, driving generators producing 8 MW of clean electricity.

04
๐ŸŒ

Grid Distribution

Electricity is stepped up to 69 kV and fed into the Luzon grid via a dedicated transmission line to power Northern Luzon.

๐Ÿ“Š Hydrology & Power

Technical Specifications

Detailed engineering parameters from the Pre-Feasibility Study with an interactive power output calculator.

โšก Project Parameters

Project NameLaconwap 3 MHPP
Rated Capacity8.0 MW
Turbine TypeFrancis (Horizontal)
Number of Units2 ร— 4 MW
Gross Head155 m
Net Head148 m
Design Flow (Q)7.0 mยณ/s
Penstock Length2,700 m
Penstock Diameter1.2 m
Turbine Efficiency92 %
Generator Efficiency95 %
Transformer Efficiency97.2 %
Catchment Area67 kmยฒ
Annual Energy Output38.5 GWh

๐Ÿงฎ Power Output Calculator

Adjust flow rate and head to simulate power generation for the Laconwap 3 MHPP.

Flow Rate (Q) 7.0 mยณ/s
Net Head (H) 148 m
Overall Efficiency (ฮท) 84.96%
Estimated Power Output
8.63 MW

P = (7.0 ร— 148 ร— 9.81 ร— 0.8496) / 1000

๐Ÿ“ˆ Financial Blueprint

3-Year Plan & Investment Facility

โ‚ฑ20M pre-construction work plan with USD $35M equity investment facility structured in 5 tranches through Silicon Valley Global PH.

ActivityCost (โ‚ฑ)
Updated Topographic Survey (LIDAR)1,800,000
Geotechnical Drilling & Analysis1,200,000
Updated Hydrology Study800,000
EIS / ECC Application1,500,000
NCIP CP Processing500,000
Project Management Office350,000
ActivityCost (โ‚ฑ)
Detailed Engineering Design (DED)3,500,000
Electromechanical Design1,200,000
Transmission Line Design800,000
Financial Modeling & PPA Negotiation1,000,000
Legal & Regulatory Compliance1,000,000
Administrative & Contingency800,000
ActivityCost (โ‚ฑ)
EPC Contractor Procurement1,500,000
Access Road & Site Preparation1,500,000
Community Development Fund800,000
Equipment Deposits & Procurement1,000,000
Final Contingency & Reserves750,000
๐Ÿฆ Silicon Valley Global PH

USD $35M Investment Facility

Equity Investment Agreement providing staged capital deployment across 5 tranches, managed through Land Bank of the Philippines.

Tranche 1 Initial development & pre-construction activities $5,000,000
Tranche 2 Detailed engineering design & site preparation $7,000,000
Tranche 3 Equipment procurement & civil works commencement $8,000,000
Tranche 4 Electromechanical installation & testing $8,000,000
Tranche 5 Commissioning, grid connection & working capital $7,000,000
Total Investment Facility $35,000,000
๐Ÿข Corporate Structure

Governance & Partners

A multi-stakeholder partnership combining indigenous community leadership, engineering expertise, and international investment.

๐Ÿ—

NLCDCInc.

EPC Contractor

Northern Luzon Construction & Development Co. โ€” Engineering, Procurement & Construction partner with regional expertise.

๐Ÿ’Ž

SVG PH

Investment Partner

Silicon Valley Global Philippines โ€” USD $35M equity investment facility providing staged capital deployment for the project.

๐Ÿฆ

Land Bank

Banking Partner

Land Bank of the Philippines โ€” Government financial institution managing the Relationship Manager Account (RMA) for fund administration.

โšก

DOE

Regulatory Authority

Department of Energy โ€” Awarded Service Contract SC-2020-04-0013 for the development and operation of the 8 MW facility.

๐Ÿ› Corporate Governance

Board of Directors & Executive Leadership

Corporate governance, international investment oversight, engineering leadership, and indigenous community stewardship for the 18 MW Laconwap River Cascade Hydroelectric Program.

Mohammad Sazzad Hossain Khan

Mohammad Sazzad Hossain Khan

Chairman of the Board

SVG PH

Carlos Antonio Baltazar III

Carlos Antonio Baltazar III

Director

SVG PH

MD

Max Duguiang

President

LGEI

Jimmy S. Santiago

Jimmy S. Santiago

Director / Incorporator

LGEI โ€ข Mountain Province

Jocilyn J. Khan

Jocilyn J. Khan

Director

SVG PH

Mohammad Ismail Hossain Khan

Mohammad Ismail Hossain Khan

Director

SVG PH

Ma. Angelyn J. Khan

Ma. Angelyn J. Khan

Director

SVG PH

JT

Jerry S. Tiongson

Director / Incorporator

LGEI โ€ข Pampanga

JW

Jun-jun B. Wag-e

Director / Incorporator

LGEI โ€ข Benguet

JC

Julius Calicaban

Director / Incorporator

LGEI โ€ข Baguio City

JW

Jonathan B. Wag-e

Corporate Secretary & Director

Indigenous Peoples / LGEI

PS

Peter S. Santiago

Director / Incorporator

LGEI โ€ข Benguet

JS

Junifer Sagalen Santiago

Director / Incorporator

LGEI โ€ข Baguio City

๐Ÿ“ Documentation

Key Documents

๐Ÿ“Š

Summary of Accomplishments

As of December 2025 โ€” NLCDC & LGEI

Comprehensive report covering technical PFS, geological assessment, DOE service contracts, and financial plans.

๐Ÿฆ

LBP RMA Account Request

Land Bank of the Philippines

Relationship Manager Account request for institutional administration of the USD $35M investment facility fund flows.

๐Ÿ“œ

Equity Investment Agreement

SVG PH โ€” LGEI $35M Facility

Silicon Valley Global Philippines equity investment facility defining the staged 5-tranche capital drawdown framework.

๐Ÿ“ฌ Get in Touch

Contact LGEI

Interested in the Laconwap 3 Mini-Hydro Power Project? Reach out for investment inquiries, partnership opportunities, or technical information.

Laconwap Green Energy Inc.

Registered under SEC CS202060596 as a renewable energy project developer focused on run-of-river hydroelectric power in Northern Luzon, Philippines.

๐Ÿ“ฑ
Mobile / WhatsApp
โœ‰๏ธ
๐Ÿ“
Project Site
Nagtipunan, Quirino &
Dupax del Norte, Nueva Vizcaya
Philippines
๐ŸŒ
Website
www.laconwap.com

Send an Inquiry

โœ… Message sent successfully!